سفارش تبلیغ
صبا ویژن

What are the connection methods for HDPE pipes?

HDPE (High-Density Polyethylene) pipes can be connected in various ways depending on engineering requirements, pressure ratings, and construction conditions. Below are the common HDPE pipe connection methods and their characteristics:

1. Heat Fusion

Application: Pressure pipe systems (e.g., water supply, gas pipelines)
Advantages: Strong sealing, high joint strength (close to the pipe material itself)
Disadvantages: Requires specialized equipment and trained operators

Type

Key Steps

Applicable Pipe Sizes

Butt Fusion

Heats pipe ends to a molten state, then presses them together (requires trimming, temperature control at 200-220°C)

DN20-DN1200

Electrofusion

Uses fittings with built-in heating wires (automated temperature control, suitable for confined spaces)

DN20-DN400

Socket Fusion

Simultaneously heats pipe end and fitting before insertion (common for small-diameter pipes)

DN20-DN110

2. Mechanical Joints

Application: Temporary projects, non-pressure pipelines, or repairs
Advantages: Quick installation, detachable
Disadvantages: Requires periodic sealing inspection

Type

Features

Flange Connection

Bolted flange connection with gasket sealing, suitable for valve/equipment connections

Clamp Coupling

Uses stainless steel clamps to compress rubber seals, ideal for emergency repairs or connecting different materials

Compression Fitting

Seals via threaded compression, typically used for small pipes (DN ≤ 63)

3. Other Connection Methods

Method

Description

Steel-Plastic Transition Fitting

Connects HDPE to metal pipes (internal sealing and anti-pullout structure)

Heat-Shrink Sleeve Connection

Uses a heat-shrink sleeve to seal joints by flame heating (common for cable protection pipes)

 

Selection Recommendations

Pressure pipelines: Prefer heat fusion (Butt Fusion > Electrofusion)

Non-pressure pipelines: Mechanical connections are more economical (e.g., clamp couplings for drainage pipes)

Special environments:

Underground concealed works → Heat fusion

Confined spaces → Electrofusion

Temporary projects → Flange/Clamp connections

 

Important Notes

Clean pipe ends before heat fusion to avoid contamination.

 

Mechanical connections require periodic seal inspection (recommended replacement every 5 years).

Official website: www.phtopindustry.com | www.pefitting.net
Contact us: Email:inquiry@phtopindustry.com | Whatsapp:+86 15093100892
Company address: Room 802, 8th Floor, Building 5, Jinyin Modern City, Jinshui District, Zhengzhou City, Henan Province, China